Connect with us
[the_ad_placement id="manual-placement"] [the_ad_placement id="obituaries"]

News

USACE publishes mainline levees Final Supplemental Environmental Impact Statement

Published

on

Friday, the U.S. Army Corps of Engineers published its Final Supplement II to the 1976 Final Environmental Impact Statement, Mississippi River and Tributaries Project, Mississippi River Mainline Levees in the Federal Register.

Through evaluation of information and data obtained from levee inspections, seepage analyses, research, studies and engineering assessments, the USACE Memphis, Vicksburg and New Orleans districts collectively identified 143 additional work items along various reaches of the Mississippi River mainline levees  feature of the MR&T project. These work items are remedial measures to control seepage and/or raise and stabilize deficient sections of the existing levees and floodwalls to maintain the structural integrity and stability of the MRL system.

The 143 work items constitute the proposed action for this Final SEIS II and are located across portions of seven states: Illinois, Missouri, Kentucky, Tennessee, Arkansas, Mississippi and Louisiana. This document is intended to supplement and, as necessary, augment the 1976 FEIS and 1998 Supplemental EIS to achieve USACE’s primary goals for the MR&T:

  • providing flood risk reduction from the Project Design Flood; and
  • being an environmentally sustainable project.

The Final SEIS II is available online at the USACE Vicksburg District website. The 30-day review period begins Friday, Nov. 13, and ends Monday, Dec. 14.

See a typo? Report it here.